Our methods

How we work — explained simply

Seven homeowner guides: when you need it, how it works, what affects the price, and what we will never do. No jargon.

Our methods

Choose your job type

Excavation
Homeowner guide

Excavation

For an addition, pool, shed or garage, excavation usually takes 1 to 5 working days depending on depth and yard access. The golden rule: confirm buried services and soil stability before the first bucket-load.

Read the guide
French drain
Homeowner guide

French drain

If you see humidity, cracks or white stains on your basement walls, the French drain around your foundation has probably stopped draining water properly. Replacing it usually takes 3 to 7 working days, depending on yard access.

Read the guide
Grading
Homeowner guide

Grading

Grading corrects slopes, removes unstable soil and creates a solid base before pavers, lawn, concrete or landscaping. A typical residential yard takes 1 to 5 working days depending on area and how much imported material is needed.

Read the guide
Concrete slab
Homeowner guide

Concrete slab

An early-cracking slab almost always has a base problem, not a concrete problem. A standard residential pour is 1 to 2 days plus 7 days curing before walking and 28 days before heavy vehicles. Done right, a Quebec slab lasts 30 years or more.

Read the guide
Concrete demolition
Homeowner guide

Concrete demolition

A residential demolition usually takes 1 to 3 days. We cut, break in controlled sections, load and haul out — without damaging what should stay or cracking nearby structures.

Read the guide
Sewer and water
Homeowner guide

Sewer and water

Basement backup, low flow, sewer odour or settling ground along the pipe usually means your service connection has a problem that needs digging. A full water entry or sewer connection replacement typically takes 1 to 5 working days, plus the municipal permit delay.

Read the guide
Roof snow removal
Homeowner guide

Roof snow removal

Above 60-90 cm of accumulation, or if you see ice dams or ceiling water stains, it's time to act. A residential roof clearing usually takes 2 to 6 hours depending on roof pitch, area and number of storeys.

Read the guide